|
TEL: 0191 4911069
|
|
ExCEL Phase 2Following our successful installation of the louvres for Phase 1 of ExCEL conference centre in the London Docklands, ADS were successful in our tender for the second phase. ADS supplied and installed our class A & B 75mm pitch louvre systems to the roof level louvred turrets and the facade walls. ADS worked closely with the envelope contractor to eliminate the risk of falling through the opeings, this involved co-ordination from all parties to ensure that the programme was not compromised and Health and Safety issues were addressed. ADS also supplied and installed numerous louvred smoke ventilators to fix onto upstands on the roof. We were also requested to integrate our 'flap' smoke ventilators onto the roof section of the louvred turrets. Similar Projects |
We work in the following sectors: Health & Education, Industrial, Commercial, Transport, Public Buildings, Retail, Leisure, Hotels, Stadia, Secure Units, Wind Farms Ikea Distribution Centre, Doncaster ExCEL Conference Centre Phases 1 & 2, London Docklands Queen Anne's Gate, Ministry of Justice, London Patternoster Square (London Stock Exchange), London Siemens Manufacturing Facility, North Tyneside Samsung Training Centre, Teesside Guernsey Airport
|